Table of contents
Overview
The EDI ANSI X12 947 – Materials Produced transaction is a specialized use of the standard 947 Inventory Adjustment message, used to communicate the completion of finished goods at a manufacturing or packaging site. It is typically sent by contract manufacturers (CMOs), internal production facilities, or third-party logistics providers (3PLs) to notify brand owners or upstream partners that production is complete and goods are now in inventory.
With TraceLink’s Opus Platform and B2N Integrate-Once™ architecture, the EDI ANSI X12 947 – Materials Produced transaction enables real-time visibility into production output, supports inventory reconciliation, and ensures traceability for serialized and lot-controlled products.
Key Use Cases
- Notify brand owners that finished goods have been produced and are ready for shipment or quality inspection.
- Update inventory systems with newly available stock from production.
- Trigger downstream processes such as invoicing, ASN generation, or replenishment planning.
- Support batch-level traceability and serialization compliance in regulated industries.
- Enable real-time production visibility across global CMOs and internal sites.
- Reduce manual reporting and improve coordination between manufacturing and supply chain teams.
Data Elements Included
An EDI ANSI X12 947 – Materials Produced transaction includes:
- Transaction Set Purpose Code: Identifies the transaction as a production completion or inventory addition.
- Finished Goods Identifiers: GTIN, NDC, SKU, or internal product codes used to identify the final product.
- Quantity Produced: Total number of units or packages completed and added to inventory.
- Lot/Batch Numbers or Serial Numbers: Required for traceability, especially in regulated industries such as pharma or medical devices.
- Production Order or Work Order Reference: Links the finished goods to the corresponding manufacturing or packaging batch.
- Production Completion Date/Time: Indicates when the finished goods were completed and entered into inventory.
- Inventory Location: The specific warehouse, CMO, or packaging site where the goods are now stored.
- Inventory Status Code: Indicates readiness—e.g., “available,” “on hold,” or “pending QA release.”
- Packaging Hierarchy Details (if applicable): Information on how finished goods are packed (e.g., unit, case, pallet).
- Reference Numbers: Related to upstream orders, lot genealogy, or serialized packaging events.
Benefits of EDI ANSI X12 947 – Materials Produced
- Provides real-time visibility into finished goods availability across production sites.
- Improves inventory accuracy and readiness for fulfillment or distribution.
- Enables faster downstream processes such as invoicing, ASN creation, or replenishment.
- Supports compliance with serialization, lot tracking, and regulatory requirements.
- Enhances collaboration and transparency between brand owners and CMOs.
- Scales across global partners using B2N Integrate-Once™, eliminating custom point-to-point integrations.
How TraceLink Supports EDI ANSI X12 947 – Materials Produced
TraceLink’s Opus Platform, powered by B2N Integrate-Once™, enables secure, scalable, and automated reporting of finished goods production:
- Real-time integration with MES, ERP, and inventory systems at internal and external production sites.
- Automated inventory updates to reflect finished goods availability.
- Secure, traceable data exchange for serialized and lot-controlled products.
- Linkage to production orders and QA release workflows for end-to-end traceability.
- Production dashboards to monitor finished goods status, batch-level output, and release readiness.
- Global partner connectivity via B2N Integrate-Once™, allowing you to connect once and collaborate with all CMOs/manufacturing, packaging sites and 3PLs.
Explore More EDI ANSI X12 Capabilities
- EDI ANSI X12 850 – Purchase Orders: Automate order placement and reduce procurement errors.
- EDI ANSI X12 856 – Advance Ship Notice: Provide shipment details and packaging structure ahead of delivery.
- EDI ANSI X12 947 – Inventory Adjustment: Communicate inventory changes due to receipts, issues, or cycle counts.
- EDI ANSI X12 830 – Forecast Planning Schedule Response: Share long-term demand forecasts to improve supplier planning and supply continuity.
- EDI ANSI X12 947 – Materials Consumed: Report material usage during production for reconciliation and compliance.
- EDI ANSI X12 947 – Materials Issued: Notify issuance of materials from inventory to production for tracking and planning.
Need Help Implementing EDI ANSI X12?
Contact us to learn how our OPUS Platform and B2N Integrate-Once™ model can help you gain real-time production visibility, automate finished goods reporting, and ensure compliance across your global manufacturing and packaging network.